AlertsTo keep you informed of important messages from the city! |
2026-07-17
LIFTING of the boil water advisory issued for Aesop, Allard, Derome, Edmond, Pasquini, Massabni, Renaud and du Souvenir streetsLIFTING of the boil water advisory issued for Aesop, Allard, Derome, Edmond, Pasquini, Massabni, Renaud and du Souvenir streets
|
|
2026-07-16
LIFTING of the preventive boil water advisory issued on July 13 for addresses from 2950 to 3009 Edmond StreetLIFTING of the preventive boil water advisory issued on July 13 for addresses from 2950 to 3009 Edmond Street
|
|
Works InfoStay informed about the work being carried out in the city, whether it involves road repairs, infrastructure maintenance, work on the water network, or park redevelopment. For any questions or to report an issue related to the work, please call 514-694-4100. |
2026-07-09
Roadway Rehabilitation – Sainte-Marie East OverpassRoadway Rehabilitation on Sainte-Marie East Overpass, from July 9 to 21, 2026.
|
|
2026-06-29
Reconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersectionReconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersection, starting June 29.
|
|
|
2026-06-15
Road Reconstruction – Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St.Road Reconstruction: Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St. More details...
|
|
|
2026-06-01
Road Reconstruction – Beaubois StreetRoad Reconstruction on Beaubois Street. More details...
|
© 2026 Town of Kirkland | Copyright | Web Design: ViGlob