To keep you informed of important messages from the city!
2026-06-23
June 25, 2026 - Drinking water supply interruption AND boil water advisory for Derome Street
Drinking water supply interruption AND boil water advisory for all addresses on Derome Street.
June 25, 2026 - Drinking water supply interruption AND boil water advisory for Derome Street
Notice to affected residences:
Derome St.: all addresses (1 to 12)
Please note that the water supply to your household will be temporarily interrupted between 9 a.m. and 3 p.m. on Thursday, June 25, 2026, to allow for work to be carried out in your area. In preparation for this work, we recommend that you stock up on potable water to meet your consumption needs during this period.
Once water supply is restored, a preventative boil-water advisory will be in effect for a minimum of 48 hours and until further notice.
Preventative Boil-Water Advisory
RECOMMENDATIONS:
Please note that you must boil your tap water (bringing it to a bubbling boil) for at least 1 minute before drinking it, or use bottled water for:
drinking or preparing beverages;
preparing baby bottles and baby food;
washing and preparing food to be eaten raw (fruits, vegetables, etc.);
preparing food that doesn’t require long cooking time;
making ice cubes;
brushing your teeth or rinsing your mouth;
providing water to pets.
YOU MAY USE UNBOILED TAP WATER TO :
prepare food and dishes that require long boiling time for cooking;
wash dishes in hot water, making sure to dry them well;
wash clothing;
take a shower or bath (make sure that young children do not swallow water while bathing).
Lifting of the boil-water advisory
Water samples will be collected from various locations and submitted for laboratory analysis. The boil-water advisory will be lifted once we receive the results of these tests, which requires a minimum of 48 hours.
Please consult the Alertssection of the website for updates regarding the lifting of the boil water advisory.
Questions?
If you require additional information, please call 514 694-4100, ext. 3143. Outside regular business hours, please call 514 630-1234.
Thank you for your understanding.
2026-06-22
June 23, 2026 - Drinking water supply interruption AND boil water advisory for Pasquini Street
Drinking water supply interruption AND boil water advisory for all addresses on Pasquini Street.
June 23, 2026 - Drinking water supply interruption AND boil water advisory for Pasquini Street
Notice to affected residences:
Pasquini St.: all addresses (1 to 33)
Please note that the water supply to your household will be temporarily interrupted between 9 a.m. and 3 p.m. on Tuesday, June 23, 2026, to allow for work to be carried out in your area. In preparation for this work, we recommend that you stock up on potable water to meet your consumption needs during this period.
Once water supply is restored, a preventative boil-water advisory will be in effect for a minimum of 48 hours and until further notice.
Preventative Boil-Water Advisory
RECOMMENDATIONS:
Please note that you must boil your tap water (bringing it to a bubbling boil) for at least 1 minute before drinking it, or use bottled water for:
drinking or preparing beverages;
preparing baby bottles and baby food;
washing and preparing food to be eaten raw (fruits, vegetables, etc.);
preparing food that doesn’t require long cooking time;
making ice cubes;
brushing your teeth or rinsing your mouth;
providing water to pets.
YOU MAY USE UNBOILED TAP WATER TO :
prepare food and dishes that require long boiling time for cooking;
wash dishes in hot water, making sure to dry them well;
wash clothing;
take a shower or bath (make sure that young children do not swallow water while bathing).
Lifting of the boil-water advisory
Water samples will be collected from various locations and submitted for laboratory analysis. The boil-water advisory will be lifted once we receive the results of these tests, which requires a minimum of 48 hours.
Please consult the Alertssection of the website for updates regarding the lifting of the boil water advisory.
Questions?
If you require additional information, please call 514 694-4100, ext. 3143. Outside regular business hours, please call 514 630-1234.
Thank you for your understanding.
2026-06-19
June 22, 2026 - Drinking water supply interruption AND boil water advisory for Allard Street
Drinking water supply interruption AND boil water advisory for all addresses on Allard Street
June 22, 2026 - Drinking water supply interruption AND boil water advisory for Allard Street
Notice to affected residences:
Allard St.: all addresses (1 to 12)
Please note that the water supply to your household will be temporarily interrupted between 8 a.m. and 3 p.m. on Monday, June 22, 2026, to allow for work to be carried out in your area. In preparation for this work, we recommend that you stock up on potable water to meet your consumption needs during this period.
Once water supply is restored, a preventative boil-water advisory will be in effect for a minimum of 48 hours and until further notice.
Preventative Boil-Water Advisory
RECOMMENDATIONS:
Please note that you must boil your tap water (bringing it to a bubbling boil) for at least 1 minute before drinking it, or use bottled water for:
drinking or preparing beverages;
preparing baby bottles and baby food;
washing and preparing food to be eaten raw (fruits, vegetables, etc.);
preparing food that doesn’t require long cooking time;
making ice cubes;
brushing your teeth or rinsing your mouth;
providing water to pets.
YOU MAY USE UNBOILED TAP WATER TO :
prepare food and dishes that require long boiling time for cooking;
wash dishes in hot water, making sure to dry them well;
wash clothing;
take a shower or bath (make sure that young children do not swallow water while bathing).
Lifting of the boil-water advisory
Water samples will be collected from various locations and submitted for laboratory analysis. The boil-water advisory will be lifted once we receive the results of these tests, which requires a minimum of 48 hours.
Please consult the Alertssection of the website for updates regarding the lifting of the boil water advisory.
Questions?
If you require additional information, please call 514 694-4100, ext. 3143. Outside regular business hours, please call 514 630-1234.
Thank you for your understanding.
Works Info
Stay informed about the work being carried out in the city, whether it involves road repairs, infrastructure maintenance, work on the water network, or park redevelopment.
For any questions or to report an issue related to the work, please call 514-694-4100.
2026-06-22
Road Rehabilitation – Hymus Boulevard
Road Rehabilitation on Hymus Boulevard, between Saint-Charles Boulevard and Sainte-Marie Road, from June 29 to July 10, 2026.
Road Rehabilitation – Hymus Boulevard
- Update: June 22, 2026 -
Dates: June 29 to July 10, 2026
Location: Hymus Boulevard, between Saint-Charles Boulevard and Sainte-Marie Road
Nature of the work: Road scarification and paving work will be carried out at night, between 9 p.m. and 5 a.m. Reconstruction of certain sidewalk sections and drainage corrections will take place during the day.
Expected impacts: Complete closure of Hymus Boulevard, between 9 p.m. and 5 am. Road users will be asked to follow the temporary signage in place to bypass the work zone.
Local traffic as well as access to properties will be maintained at all times.
Road Rehabilitation on Château-Kirkland Street, between Jacques-Chan and Discepola streets, from June 22 to mid-July.
Road Rehabilitation – Château-Kirkland Street
- Update: June 22, 2026 -
The scarification work, as well as the adjustment of manholes and catch basins, will begin this week.
Dates: June 22 to mid-July 2026
Location: Château-Kirkland Street, between Jacques-Chan and Discepola streets
Nature of the work: Road scarification and repaving work
Expected impacts: Traffic will be maintained with reduced lanes. Road users will be asked to follow the temporary signage in place to bypass the work zone.
Road Reconstruction – Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St.
Road Reconstruction: Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St. More details...
Road Reconstruction – Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St.
- Update: June 11, 2026 -
Dates: June 15 to late August, 2026
Targeted location: Place du Souvenir, Aesop St., Allard St., Derome St. and Pasquini St.
Nature of work:
Reconstruction of curbs, upper foundation and paving
Electrical work and installation of LED lighting
Replacement of fire hydrants and valves
Traffic: Local traffic will be maintained for the duration of the work.
*Residents planning landscaping work, driveway repairs, exterior painting, window washing or similar projects are advised to wait until the end of the construction period.
Fire Hydrant Painting – Lacey Green East and West areas
Fire Hydrant Painting – Lacey Green East and West areas
Fire Hydrant Painting – Lacey Green East and West areas
Painting work on fire hydrants will begin on Thursday, June 11, in the Lacey Green East and West areas. The work is expected to be completed by the end of June.
During this period, some fire hydrants will be temporarily painted grey. This is a normal step in the process and prepares the hydrants for the final red coat, which will be applied afterward.
Au total, 155 bornes d’incendie seront peinturées dans le cadre de ces travaux.
2026-06-01
Road Reconstruction – Beaubois Street
Road Reconstruction on Beaubois Street. More details...
Road Reconstruction – Beaubois Street
- Update: June 23, 2026 -
Curb construction work on June 25 starting at 7 a.m.
Affected locations: even-numbered addresses 2 to 38
Residents whose property is located within this area will not have access to their driveway for approximately 24 hours. They are therefore asked not to park their vehicle on the street or in their driveway as of 6 a.m. on June 25.
To ensure optimum results, it is very important that there be no through traffic within the construction zone throughout this period of time. We ask the residents who will park their vehicles on adjacent streets to observe the parking signs in place.
In the event of rain or if the work cannot be completed, it will be rescheduled to the next business day.
Dates: June 1 to mid-July 2026
Targeted location: Beaubois Street
Nature of work:
Reconstruction of curbs, upper foundation and paving
Electrical work and replacement of lamp post shafts
Replacement of fire hydrants and valves
Traffic: Local traffic will be maintained throughout the duration of the work*.
*Residents planning landscaping work, driveway repairs, exterior painting, window washing or similar projects are advised to wait until the end of the construction period.
2026-05-19
Watermain Rehabilitation work - Calais Street
Watermain rehabilitation work by structural lining
Watermain Rehabilitation work - Calais Street
- Update: June 22, 2026 -
The contractor has completed the liner insertion work as well as the replacement of service boxes. Backfilling of the access pits and paving work are currently underway.
Dates: May 19 to mid-July 2026
Targeted location: Calais street
Nature of work: Watermain rehabilitation work by structural lining: a process that involves inserting a highly durable structural liner inside the existing pipe, thereby extending its service life by more than 25 years.
Temporary drinking water supply system:
The temporary drinking water supply system was put into operation on May 25. The relevant documentation on this matter was distributed to all affected residents.
To report a problem: A 24-hour service is available for any issues with the temporary water distribution system: call 579-229-0342.
Local traffic as well as access to properties will be maintained at all times.
Watermain Rehabilitation work - Montague, Charlevoix & Sutton streets
Watermain rehabilitation work by structural lining
Watermain Rehabilitation work - Montague, Charlevoix & Sutton streets
- Update: June 22, 2026 -
The water main was put back into service on June 19. Backfilling of the access pits and paving work are currently underway, as is the dismantling of the temporary drinking water supply system.
Dates: May 4 to early September 2026
Targeted location: Montague, Charlevoix and Sutton Streets
Nature of work: Watermain rehabilitation work by structural lining: a process that involves inserting a highly durable structural liner inside the existing pipe, thereby extending its service life by more than 25 years.
Local traffic as well as access to properties will be maintained at all times.
Here are a few tips to follow when planting a young tree to help it survive in the first three years of growth
Water supply
Watering must be done directly at the base, into the basin in order to be effective. Adding mulch around the watering basin is beneficial hence slowing down water evaporation and keeping humidity much longer. Watering frequency should be at least once a week, except during heavy rain falls, and should be increased during hot temperatures. At least 15 liters of water is needed per watering, to saturate the ground to a depth of 30 cm. Also, keep watering throughout the fall months, for as long as there are leaves in the tree.
Tree trunk and root protection
Bark acts as a protection barrier that shelters the tree’s internal vital system. On young trees, the bark is tender, therefore fragile, thus the importance of keeping it intact! The watering basin ensures this protection by adding a buffer zone that prevents possible damages with lawn care equipment. A protector can also be kept in place at the base of the tree only if it is not tight around the trunk and if it has openings, allowing air circulation. After the tree’s critical growth stage in the first three years, the watering basin can be dismantled by leveling out the soil and adding mulch.
It is also important not to compact the soil around the tree, since this will hinder root development outside its trench.
Detrimental Practices!
Avoid over-watering, as it will make the leaves turn yellow or fall down.
You should not rely on your lawn sprinkler system to water your tree since it was not designed and installed for that specific purpose.
Don’t plant shrubs or flowers at the base of the tree.
Don’t bury the by heaping up soil or mulch around the trunk base. This will cause decaying of the bark and will lead to the tree’s death.
Don’t install Christmas lights on a young tree. The weight of the wires and bulbs could cause branches to break. Furthermore, the buds could be ripped off, which would jeopardize the development of future branches and the trees photosynthesis capacities.
Don’t install cement blocks, bricks, rocks or any other heavy material around the tree.
IMPORTANT
When planting a new tree on your property, it is advisable not to encroach on the right-of-way where there are usually underground pipes passing through. In case of a break in these sections of the pipes, the tree that is in the right-of-way will probably have to be removed for repairs to be carried out. For your information, the main water valve in front of your property is located, in most cases, at the right-of-way line and can therefore be used as a reference to determine the approximate distance of this line.
Tree Illustration: Source Espace pour la vie / Audrey Desaulniers
In order to better understand the use of our website and provide you with an enhanced and personalized experience, we use technologies, such as cookies, to access usage information. Accepting the use of these technologies will enable us to collect and process data such as your browsing behaviour and allow us to learn what works and what needs to be improved. Refusing or withdrawing your acceptance may have a negative effect on certain functions. We will only use cookies if you agree by clicking "Accept". You can also choose to decline by clicking on "Decline". For more information, please consult our Privacy Policy.
In order to better understand the use of our website and provide you with an enhanced and personalized experience, we use technologies, such as cookies, to access usage information. Accepting the use of these technologies will enable us to collect and process data such as your browsing behaviour and allow us to learn what works and what needs to be improved. Refusing or withdrawing your acceptance may have a negative effect on certain functions. We will only use cookies if you agree by clicking "Accept". You can also choose to decline by clicking on "Decline". For more information, please consult our Privacy Policy.