Kirkland Activities - Ville de Kirkland

Alerts

To keep you informed of important messages from the city!

2026-07-13

July 13, 2026 – Water Service Interruption AND Boil Water Advisory for Place du Souvenir

July 13, 2026 – Water Service Interruption AND Boil Water Advisory for Place du Souvenir

2026-07-13

Possible colored water and drop in water pressure in the Timberlea sector - Week of July 13 to 17

Water system pressure testing will be conducted throughout the Timberlea sector from July 13 to July 17, 2026, between 8:00 a.m. and 3:00 p.m.

2026-07-10

July 10, 2026 - Water main break in front of 3003, Edmond Street

A water main break has occurred in front of 3003 Edmond Street. Repair work is scheduled for Monday, July 13 and will require a temporary interruption of the drinking water supply, followed by a boil water advisory.

2026-07-09

July 10, 2026 – Water Service Interruption AND Boil Water Advisory for Aesop, Allard, Derome, Edmond, Pasquini, Massabni and Renaud Streets

July 10, 2026 – Water Service Interruption AND Boil Water Advisory for Aesop, Allard, Derome, Edmond, Pasquini, Massabni and Renaud Streets

2026-07-03

Boil-water advisory still in effect for Aesop, Allard, Derome, Edmond, Pasquini, Massabni, Renaud and du Souvenir streets

Boil-water advisory still in effect for Aesop, Allard, Derome, Edmond, Pasquini, Massabni, Renaud and du Souvenir streets

Works Info

Stay informed about the work being carried out in the city, whether it involves road repairs, infrastructure maintenance, work on the water network, or park redevelopment. For any questions or to report an issue related to the work, please call 514-694-4100.

2026-07-09

Roadway Rehabilitation – Sainte-Marie East Overpass

Roadway Rehabilitation on Sainte-Marie East Overpass, from July 9 to 21, 2026.

2026-06-30

Complete closure of Kirkland Boulevard, between Allancroft and Beacon streets

Complete closure of Kirkland Boulevard, between Allancroft and Beacon streets, from July 6 to 10.

2026-06-29

Reconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersection

Reconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersection, starting June 29.

2026-06-22

Road Rehabilitation – Hymus Boulevard

Road Rehabilitation on Hymus Boulevard, between Saint-Charles Boulevard and Sainte-Marie Road, from June 29 to July 13, 2026.

2026-06-22

Road Rehabilitation – Château-Kirkland Street

Road Rehabilitation on Château-Kirkland Street, between Jacques-Chan and Discepola streets, from June 22 to mid-July.

2026-06-15

Road Reconstruction – Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St.

Road Reconstruction: Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St. More details...

2026-06-01

Road Reconstruction – Beaubois Street

Road Reconstruction on Beaubois Street. More details...

2026-05-19

Watermain Rehabilitation work - Calais Street

Watermain rehabilitation work by structural lining

2026-05-04

Watermain Rehabilitation work - Montague, Charlevoix & Sutton streets

Watermain rehabilitation work by structural lining

Kirkland Activities

 

Issues :

Spring - Summer 2026

→ PDF Format
   (printable version)

Winter 2025-2026

→ PDF Format
   (printable version)

Fall 2025


→ PDF Format
   (printable version)

Summer 2025


→ PDF Format
   (printable version)

If you have questions concerning recreation or library programs, please call:

  • 514 630-2719 (recreation)
  • 514 630-2726 (library)