Alerts

To keep you informed of important messages from the city!

2025-06-30

July 2 and 3, 2025: Interruption of the drinking water supply and preventative boil-water advisory for certain addresses on Valérie Street (between Harmony and Cordova)

July 2 and 3, 2025: Interruption of the drinking water supply and preventative boil-water advisory for even addresses 22 to 48 and odd addresses 35 to 47 Valérie Street.

Works Info

Stay informed about the work being carried out in the city, whether it involves road repairs, infrastructure maintenance, work on the water network, or park redevelopment. For any questions or to report an issue related to the work, please call 514-694-4100.

2025-07-09

Southbound lane closure on Henri-Daoust Street between Brunswick Blvd. and Montague Street

The southbound lane on Henri-Daoust Street between Brunswick and Montague will be closed on July 9 from 9:30 am to 3 pm. One lane will remain open with alternating traffic, directed by two traffic control personnel.

2025-06-26

Bike path rehabilitation work, between Elkas Boulevard and des Deux Maisons Street (within the 440 right-of-way) - Work by the City of Montreal

Nature of the work: Bike path rehabilitation

2025-06-26

Refurbishment of the Town Entrance at the Pierrefonds Border

Nature of the work: Landscaping and installation of a new “Bienvenue / Welcome” sign

2025-06-17

Ecclestone Park: Bocce Court Refurbishment Work

Excavation and complete reconstruction of the current playing area

2025-06-16

Bonaventure Street : Roadway Reconstruction

Nature of the work: repair of curbs, upper road base, and paving; Electrical work and installation of LED streetlights; Rehabilitation of the water main and localized sewer repairs.

2025-05-12

Paiement Park: Reconstruction of the park

Nature of the work: Reconstruction of the park and replacement of playground equipment

2025-05-12

Heritage Park: Reconstruction of the park

Nature of the work: Reconstruction of the park, installation of new playground equipment and splash pad

2025-05-05

Holleuffer Park: General site work and Construction of a refrigerated skating rink

Nature of the work: Reconstruction of the tennis and basketball court surfaces, replacement of the lighting system and construction of a multi-purpose refrigerated ice rink.

2025-05-05

Brunswick Boulevard: Work by Hydro-Québec

Nature of the work: Implementation of an underground energy corridor to ensure electrical supply for new residential, commercial, and industrial development projects. The work will be carried out in three (3) phases and will take place from spring th

2025-04-22

Rehabilitation of the water main

From Spring to Fall 2025, the Town will be carrying out structural lining work on Kirkland Boulevard, Beacon Street, Daniel Street, Mountain View Street and Centennial Crescent. Residents affected by the work will receive letters informing them of th

Block parties

Want to throw a party with all your neighbours this summer?

Don’t forget to get your permit, available at the Town Hall or by filling out this form*. Permits for block parties are free of charge but you will need to get the signatures of your neighbours.

If you need barriers to block your street, they can be picked up at Public Works.

This summer, have fun with your neighbourhood friends!

*By completing this form, I understand that the information contained herein will be accessible to any Town employee involved in processing the file. I consent freely and knowingly to have all the information I have provided to the Town retained in accordance with the required security standards and the Town's retention rules.

Block parties