Alerts

To keep you informed of important messages from the city!

2026-09-11

Update | Water Distribution System Repairs – Timberlea District

September 11, 2026 - 3:30 pm

2026-09-09

LIFTING of the preventive boil water advisory issued on September 8 for the Timberlea District

LIFTING of the preventive boil water advisory issued on September 8 for the Timberlea District

2026-09-07

Inspection of fire hydrants from September 13 to 16 – Sector 4

Inspection of fire hydrants from September 13 to 16 – Sector 4

Works Info

Stay informed about the work being carried out in the city, whether it involves road repairs, infrastructure maintenance, work on the water network, or park redevelopment. For any questions or to report an issue related to the work, please call 514-694-4100.

2026-08-28

Street Lighting – Replacement of lampposts

Nature of the work: Replacement of lampposts to convert the old lighting source to LED.

2026-08-07

Road Reconstruction – Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St.

Road Reconstruction – Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St.

2026-06-29

Reconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersection

Reconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersection, starting June 29.

List of awarded contracts

List of awarded contracts

The list of contracts over $25,000 awarded by the municipality is published on the website of the government’s electronic tendering system SEAO (Système électronique d’appels d’offres).  To consult the SEAO website, click here.

To consult the list of contracts exceeding $2,000 and totalling $25,000 or more awarded by the municipality to a same supplier for the period of : 

To consult Kirkland’s municipal by-law No. GEN 2019-52 on contract management, click here.