Green line - Ville de Kirkland

Alerts

To keep you informed of important messages from the city!

2026-07-13

July 13, 2026 – Water Service Interruption AND Boil Water Advisory for Place du Souvenir

July 13, 2026 – Water Service Interruption AND Boil Water Advisory for Place du Souvenir

2026-07-13

July 13, 2026 - Water Service Interruption AND Boil Water Advisory for certain addresses on Edmond Street

July 13, 2026 - Water Service Interruption AND Boil Water Advisory for certain addresses on Edmond Street

2026-07-13

Possible colored water and drop in water pressure in the Timberlea sector - Week of July 13 to 17

Water system pressure testing will be conducted throughout the Timberlea sector from July 13 to July 17, 2026, between 8:00 a.m. and 3:00 p.m.

2026-07-03

Boil-water advisory still in effect for Aesop, Allard, Derome, Edmond, Pasquini, Massabni, Renaud and du Souvenir streets

Boil-water advisory still in effect for Aesop, Allard, Derome, Edmond, Pasquini, Massabni, Renaud and du Souvenir streets

Works Info

Stay informed about the work being carried out in the city, whether it involves road repairs, infrastructure maintenance, work on the water network, or park redevelopment. For any questions or to report an issue related to the work, please call 514-694-4100.

2026-07-09

Roadway Rehabilitation – Sainte-Marie East Overpass

Roadway Rehabilitation on Sainte-Marie East Overpass, from July 9 to 21, 2026.

2026-06-30

Complete closure of Kirkland Boulevard, between Allancroft and Beacon streets

Complete closure of Kirkland Boulevard, between Allancroft and Beacon streets, from July 6 to 10.

2026-06-29

Reconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersection

Reconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersection, starting June 29.

2026-06-22

Road Rehabilitation – Hymus Boulevard

Road Rehabilitation on Hymus Boulevard, between Saint-Charles Boulevard and Sainte-Marie Road, from June 29 to July 13, 2026.

2026-06-22

Road Rehabilitation – Château-Kirkland Street

Road Rehabilitation on Château-Kirkland Street, between Jacques-Chan and Discepola streets, from June 22 to mid-July.

2026-06-15

Road Reconstruction – Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St.

Road Reconstruction: Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St. More details...

2026-06-01

Road Reconstruction – Beaubois Street

Road Reconstruction on Beaubois Street. More details...

2026-05-19

Watermain Rehabilitation work - Calais Street

Watermain rehabilitation work by structural lining

2026-05-04

Watermain Rehabilitation work - Montague, Charlevoix & Sutton streets

Watermain rehabilitation work by structural lining

Green Line

Service available from April to October

The Town of Kirkland provides you with the services of an eco-counsellor to answer all of your environmental concerns.

The eco-counsellor is at your service for information about good maintenance practices to keep your lawn and landscaping healthy while protecting our environment. He will inform you about appropriate techniques for fertilizing, liming, aeration, mowing, topdressing, overseeding and irrigating your lawn.


In the case of infestation, such as white grubs, the eco-counsellor will be able to answer your questions on the use of alternate solutions to pesticides, such as bio-pesticides, insecticidal soaps and other products.

Ligne_verte.jpg

To reach the Green Line:

Phone: 514 630-2748

Email: ligneverte@ville.kirkland.qc.ca

It’s free, take advantage!