AlertsTo keep you informed of important messages from the city! |
2026-08-03
Monday, August 3 - Pressure Testing and Boil Water Advisory for Agincourt and St-Tropez streetsMonday, August 3 - Pressure Testing and Boil Water Advisory for Agincourt and St-Tropez streets
|
|
2026-08-01
Saturday, August 1 - Watermain break on Beacon Street causing reduced water pressure and possible discoloured waterWatermain break on Beacon Street causing reduced water pressure and possible discoloured water
|
|
|
2026-07-31
LIFTING of the preventive boil water advisory issued on July 27 for Woodbrooke CourtLIFTING of the preventive boil water advisory issued on July 27 for Woodbrooke Court
|
|
|
2026-07-30
LIFTING of the preventive boil water advisory issued on July 29 for Elkas Blvd., Théorêt St., Brien St., Snair St., place Semenchuk, place Raymond and Jean Yves St.LIFTING of the preventive boil water advisory issued on July 29 for Elkas Blvd., Théorêt St., Brien St., Snair St., place Semenchuk, place Raymond and Jean Yves St.
|
|
Works InfoStay informed about the work being carried out in the city, whether it involves road repairs, infrastructure maintenance, work on the water network, or park redevelopment. For any questions or to report an issue related to the work, please call 514-694-4100. |
2026-07-09
Roadway Rehabilitation – Sainte-Marie East OverpassRoadway Rehabilitation on Sainte-Marie East Overpass, from July 9 to August 6, 2026.
|
|
2026-06-29
Reconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersectionReconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersection, starting June 29.
|
|
|
2026-06-15
Road Reconstruction – Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St.Road Reconstruction: Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St. More details...
|
© 2026 Town of Kirkland | Copyright | Web Design: ViGlob