Alerts

To keep you informed of important messages from the city!

2026-07-16

LIFTING of the preventive boil water advisory issued on July 13 for addresses from 2950 to 3009 Edmond Street

LIFTING of the preventive boil water advisory issued on July 13 for addresses from 2950 to 3009 Edmond Street

2026-07-13

Possible colored water and drop in water pressure in the Timberlea sector - Week of July 13 to 17

Water system pressure testing will be conducted throughout the Timberlea sector from July 13 to July 17, 2026, between 8:00 a.m. and 3:00 p.m.

2026-07-03

Boil-water advisory still in effect for Aesop, Allard, Derome, Edmond, Pasquini, Massabni, Renaud and du Souvenir streets

Boil-water advisory still in effect for Aesop, Allard, Derome, Edmond, Pasquini, Massabni, Renaud and du Souvenir streets

Works Info

Stay informed about the work being carried out in the city, whether it involves road repairs, infrastructure maintenance, work on the water network, or park redevelopment. For any questions or to report an issue related to the work, please call 514-694-4100.

2026-07-09

Roadway Rehabilitation – Sainte-Marie East Overpass

Roadway Rehabilitation on Sainte-Marie East Overpass, from July 9 to 21, 2026.

2026-06-29

Reconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersection

Reconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersection, starting June 29.

2026-06-15

Road Reconstruction – Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St.

Road Reconstruction: Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St. More details...

2026-06-01

Road Reconstruction – Beaubois Street

Road Reconstruction on Beaubois Street. More details...

News


News

Retour