Alerts

To keep you informed of important messages from the city!

2026-07-06

July 6, 2026 – Water Service Interruption AND Boil Water Advisory for Aesop, Allard, Derome, Edmond, Pasquini, Massabni and Renaud Streets

July 6, 2026 – Water Service Interruption AND Boil Water Advisory for Aesop, Allard, Derome, Edmond, Pasquini, Massabni and Renaud Streets

2026-07-03

LIFTING of the preventive boil water advisory issued on June 30 for Montague Street

LIFTING of the preventive boil water advisory issued on June 30 for Montague Street

2026-07-03

Boil-water advisory still in effect for Aesop, Allard, Derome, Edmond, Pasquini, Massabni, Renaud and du Souvenir streets

Boil-water advisory still in effect for Aesop, Allard, Derome, Edmond, Pasquini, Massabni, Renaud and du Souvenir streets

Works Info

Stay informed about the work being carried out in the city, whether it involves road repairs, infrastructure maintenance, work on the water network, or park redevelopment. For any questions or to report an issue related to the work, please call 514-694-4100.

2026-07-06

Meades Park – Temporary Splash Pads Closure

Temporary Splash Pads Closure on July 6, from 10 am to 12 pm.

2026-06-30

Complete closure of Kirkland Boulevard, between Allancroft and Beacon streets

Complete closure of Kirkland Boulevard, between Allancroft and Beacon streets, from July 6 to 10.

2026-06-29

Reconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersection

Reconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersection, starting June 29.

2026-06-22

Road Rehabilitation – Hymus Boulevard

Road Rehabilitation on Hymus Boulevard, between Saint-Charles Boulevard and Sainte-Marie Road, from June 29 to July 10, 2026.

2026-06-22

Road Rehabilitation – Château-Kirkland Street

Road Rehabilitation on Château-Kirkland Street, between Jacques-Chan and Discepola streets, from June 22 to mid-July.

2026-06-15

Road Reconstruction – Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St.

Road Reconstruction: Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St. More details...

2026-06-01

Road Reconstruction – Beaubois Street

Road Reconstruction on Beaubois Street. More details...

2026-05-19

Watermain Rehabilitation work - Calais Street

Watermain rehabilitation work by structural lining

2026-05-04

Watermain Rehabilitation work - Montague, Charlevoix & Sutton streets

Watermain rehabilitation work by structural lining

TREES, THE GREAT BENEFACTORS OF URBAN AREAS

Urban trees play an essential role with regards to our well-being. Not only do they embellish the landscape, they also bring several benefits and improve air quality in many different ways, by:

  • purifying the air
  • cooling the ambient air, thus contributing to the fight against urban heat islands
  • improving and protecting soil structure and soil water quality
  • helping to counter runoff and soil erosion
  • providing protection against rain and strong winds

For all these reasons the Town of Kirkland makes considerable efforts every year to maintain, preserve and protect its urban forest.


In this section :