Snow removal - Ville de Kirkland

Alerts

To keep you informed of important messages from the city!

2026-08-21

August 21, 2026 – Pressure testing on the water distribution network - Dragon Street - to resume on Monday, August 24 between 8 a.m. and 3 p.m.

Possible discoloured water and drop in water pressure for certain addresses on Dragon street

2026-08-20

August 20, 2026 - Drinking water supply interruption AND boil water advisory for certain addresses on Charlevoix, Rougemont and Marcel-Meloche streets

Drinking water supply interruption AND boil water advisory for certain addresses on Charlevoix, Rougemont and Marcel-Meloche streets

Works Info

Stay informed about the work being carried out in the city, whether it involves road repairs, infrastructure maintenance, work on the water network, or park redevelopment. For any questions or to report an issue related to the work, please call 514-694-4100.

2026-08-07

Road Reconstruction – Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St.

Road Reconstruction – Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St.

2026-08-03

Replacement of a section of the storm sewer network on Argyle Street

Replacement of a section of the storm sewer network on Argyle Street.

2026-06-29

Reconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersection

Reconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersection, starting June 29.

Snow Removal

Your cooperation is essential!

In order for snow clearing operations to be carried out efficiently, allowing you to en joy a well ploughed street, it is important that no vehicles, recycling bins, garbage cans or other, stand in the way of the snow plough.

Snow removal and salt spreading on streets

Snow clearing operations are carried out by an outside contractor on the Town’s 120 km or roads.  Municipal employees, for their part, are responsible for salt and sand spreading operations on streets and sidewalks as well as for snow clearing of municipal building parking lots.

Priority to main arteries

During major snowfalls, priority must be given to main arteries, such as Saint-Charles, Hymus and Brunswick Boulevards, Sainte-Marie and l’Anse-à-l’Orme Roads as well as the TransCanada Highway service roads. Your patience is therefore greatly appreciated when it comes to clearing residential roads.

When do snow clearing operations begin?

  • Accumulation of less than 2.5 cm 
    When snow starts to fall (accumulation < 2.5 cm), the crew travels along main arteries, steep and curving streets as well as sidewalks, spreading salt and sand.
  • Accumulation of more than 2.5 cm
    As soon as accumulation reaches 2.5 cm, snow removal and salt spreading operations begin on the entire road network, as needed.

Damage to property

Any damage to private property resulting from snow removal operations carried out on city streets (lawns, retaining walls, curbs or other) may be reported online at any time through the Requests online system or by phone at 514 630-2727.

Come spring, we will ensure that proper repairs are carried out and charged to the snow removal contractor. Please note that the Town is not responsible for damages that may occur as a result of snow blown from the street onto the street right-of-way (part of any private property extending from the property line to the curb).
 
 

Deneigement 3.jpg

Parking in the winter time

Overnight parking on public roads is prohibited between 1 and 7 a.m. from November 15 to April 15. Parking on the street is also prohibited during or after a snowstorm.
Please note that non-compliance with this regulation may result in a fine.