Alerts

To keep you informed of important messages from the city!

2025-06-30

July 2 and 3, 2025: Interruption of the drinking water supply and preventative boil-water advisory for certain addresses on Valérie Street (between Harmony and Cordova)

July 2 and 3, 2025: Interruption of the drinking water supply and preventative boil-water advisory for even addresses 22 to 48 and odd addresses 35 to 47 Valérie Street.

Works Info

Stay informed about the work being carried out in the city, whether it involves road repairs, infrastructure maintenance, work on the water network, or park redevelopment. For any questions or to report an issue related to the work, please call 514-694-4100.

2025-07-09

Southbound lane closure on Henri-Daoust Street between Brunswick Blvd. and Montague Street

The southbound lane on Henri-Daoust Street between Brunswick and Montague will be closed on July 9 from 9:30 am to 3 pm. One lane will remain open with alternating traffic, directed by two traffic control personnel.

2025-06-26

Bike path rehabilitation work, between Elkas Boulevard and des Deux Maisons Street (within the 440 right-of-way) - Work by the City of Montreal

Nature of the work: Bike path rehabilitation

2025-06-26

Refurbishment of the Town Entrance at the Pierrefonds Border

Nature of the work: Landscaping and installation of a new “Bienvenue / Welcome” sign

2025-06-17

Ecclestone Park: Bocce Court Refurbishment Work

Excavation and complete reconstruction of the current playing area

2025-06-16

Bonaventure Street : Roadway Reconstruction

Nature of the work: repair of curbs, upper road base, and paving; Electrical work and installation of LED streetlights; Rehabilitation of the water main and localized sewer repairs.

2025-05-12

Paiement Park: Reconstruction of the park

Nature of the work: Reconstruction of the park and replacement of playground equipment

2025-05-12

Heritage Park: Reconstruction of the park

Nature of the work: Reconstruction of the park, installation of new playground equipment and splash pad

2025-05-05

Holleuffer Park: General site work and Construction of a refrigerated skating rink

Nature of the work: Reconstruction of the tennis and basketball court surfaces, replacement of the lighting system and construction of a multi-purpose refrigerated ice rink.

2025-05-05

Brunswick Boulevard: Work by Hydro-Québec

Nature of the work: Implementation of an underground energy corridor to ensure electrical supply for new residential, commercial, and industrial development projects. The work will be carried out in three (3) phases and will take place from spring th

2025-04-22

Rehabilitation of the water main

From Spring to Fall 2025, the Town will be carrying out structural lining work on Kirkland Boulevard, Beacon Street, Daniel Street, Mountain View Street and Centennial Crescent. Residents affected by the work will receive letters informing them of th

Snow Removal

Your cooperation is essential!

In order for snow clearing operations to be carried out efficiently, allowing you to en joy a well ploughed street, it is important that no vehicles, recycling bins, garbage cans or other, stand in the way of the snow plough.

Snow removal and salt spreading on streets

Snow clearing operations are carried out by an outside contractor on the Town’s 120 km or roads.  Municipal employees, for their part, are responsible for salt and sand spreading operations on streets and sidewalks as well as for snow clearing of municipal building parking lots.

Priority to main arteries

During major snowfalls, priority must be given to main arteries, such as Saint-Charles, Hymus and Brunswick Boulevards, Sainte-Marie and l’Anse-à-l’Orme Roads as well as the TransCanada Highway service roads. Your patience is therefore greatly appreciated when it comes to clearing residential roads.

When do snow clearing operations begin?

  • Accumulation of less than 2.5 cm 
    When snow starts to fall (accumulation < 2.5 cm), the crew travels along main arteries, steep and curving streets as well as sidewalks, spreading salt and sand.
  • Accumulation of more than 2.5 cm
    As soon as accumulation reaches 2.5 cm, snow removal and salt spreading operations begin on the entire road network, as needed.

Damage to property

Any damage to private property resulting from snow removal operations carried out on city streets (lawns, retaining walls, curbs or other) may be reported online at any time through the Requests on Line system or by phone at 514 630-2727.

Come spring, we will ensure that proper repairs are carried out and charged to the snow removal contractor. Please note that the Town is not responsible for damages that may occur as a result of snow blown from the street onto the street right-of-way (part of any private property extending from the property line to the curb).
 
 

Deneigement 3.jpg

Parking in the winter time

Overnight parking on public roads is prohibited between 1 and 7 a.m. from November 15 to April 15. Parking on the street is also prohibited during or after a snowstorm.
Please note that non-compliance with this regulation may result in a fine.