Stay informed about the work being carried out in the city, whether it involves road repairs, infrastructure maintenance, work on the water network, or park redevelopment.
For any questions or to report an issue related to the work, please call 514-694-4100.
2026-09-21
Court Surface Rehabilitation at Ecclestone Park
Court Surface Rehabilitation at Ecclestone Park starting Monday, September 21...
Court Surface Rehabilitation at Ecclestone Park
Date: Starting Monday, September 21
Location: Ecclestone Park
Nature of the work: Removal of the nets and acrylic court surface rehabilitation work.
Expected disruptions: The park will be closed for 5 to 10 days to allow the work to be completed and the new surface to dry. The duration of the closure may vary depending on weather conditions.
Information:
514-694-4100
2026-08-28
Street Lighting – Replacement of lampposts
Nature of the work: Replacement of lampposts to convert the old lighting source to LED.
Street Lighting – Replacement of lampposts
Dates: From August 28 to the end of October 2026, for approximately nine weeks.
Nature of the work: Replacement of lampposts to convert the old lighting source to LED.
Location:
District 2 (Holleuffer)
Elkas Street
Houde Street
Lancelot Street
Ruben Street
Snair Street
Rolland Laniel Street
District 3 (Brunswick)
Harmony Street
Valérie Street
District 5 (Lacey-Green East)
Acres Street
Oriole Street
District 6 (Canvin)
Edmond Street
District 7 (Saint-Charles)
Kirkland Boulevard
Sainte-Marie Road
de Tarragone Street
Moreau Street
Beacon Street
Alta-Vista Street
Terry Fox Street
District 8 (Summerhill)
Montrose Street
de la Châtelaine Street
Desbarats Street
Monsadel Street
2026-06-29
Reconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersection
Reconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersection, starting June 29.
Reconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersection
- Update: June 30 -
Dates: Starting June 29
Location: Saint-Charles Boulevard South, at the intersection of Sainte-Marie Road East
Nature of the work: Work will be carried out to reconfigure the right-turn lane providing access to Saint-Charles Boulevard South from Sainte-Marie Road East. This work is being carried out as part of Sotramont’s ongoing residential development project.
Traffic disruptions to be expected: The existing merge lane onto Saint-Charles Boulevard South will be completely closed. Road users must follow the new signage installed in the area.
Every fall, the Town conducts its annual fire hydrant inspection program to ensure that all hydrants meet operational and safety standards before the freezing season.
These inspections help to:
Verify that each fire hydrant is operating properly;
Ensure an adequate water supply is available in case of an emergency;
Measure water pressure and flush hydrants that are not draining properly;
Detect and repair leaks in the water distribution system.
Residents within the affected inspection sector are notified of upcoming inspection work through a Municipal Alert sent within 24 to 48 hours before the work begins (caller ID 1-866-419-5000). To sign up for Town alerts, click here
Inspection work is conducted overnight, from 11:30 p.m. to 7:30 a.m., over a period of 4 to 6 weeks beginning in September.
Possible Impacts
During the inspection work, you may notice:
A temporary drop in water pressure;
Discoloured or slightly cloudy water.
If your water appears cloudy or discoloured, run the cold water in your bathtub for approximately 15 minutes and repeat as needed until the water runs clear.
Discoloured water does not pose a health risk to people or pets.
⚠️ To avoid staining fabrics, make sure the water is completely clear before doing laundry or using any water-dependent appliance.
Questions?
For more information, contact the Public Works Department at 514-630-2727 during regular business hours or 514-630-1234 at any time.
In order to better understand the use of our website and provide you with an enhanced and personalized experience, we use technologies, such as cookies, to access usage information. Accepting the use of these technologies will enable us to collect and process data such as your browsing behaviour and allow us to learn what works and what needs to be improved. Refusing or withdrawing your acceptance may have a negative effect on certain functions. We will only use cookies if you agree by clicking "Accept". You can also choose to decline by clicking on "Decline". For more information, please consult our Privacy Policy.
In order to better understand the use of our website and provide you with an enhanced and personalized experience, we use technologies, such as cookies, to access usage information. Accepting the use of these technologies will enable us to collect and process data such as your browsing behaviour and allow us to learn what works and what needs to be improved. Refusing or withdrawing your acceptance may have a negative effect on certain functions. We will only use cookies if you agree by clicking "Accept". You can also choose to decline by clicking on "Decline". For more information, please consult our Privacy Policy.