Works Info - Ville de Kirkland

Alerts

To keep you informed of important messages from the city!

2026-07-17

LIFTING of the boil water advisory issued for Aesop, Allard, Derome, Edmond, Pasquini, Massabni, Renaud and du Souvenir streets

LIFTING of the boil water advisory issued for Aesop, Allard, Derome, Edmond, Pasquini, Massabni, Renaud and du Souvenir streets

2026-07-16

LIFTING of the preventive boil water advisory issued on July 13 for addresses from 2950 to 3009 Edmond Street

LIFTING of the preventive boil water advisory issued on July 13 for addresses from 2950 to 3009 Edmond Street

Works Info

Stay informed about the work being carried out in the city, whether it involves road repairs, infrastructure maintenance, work on the water network, or park redevelopment. For any questions or to report an issue related to the work, please call 514-694-4100.

2026-07-09

Roadway Rehabilitation – Sainte-Marie East Overpass

Roadway Rehabilitation on Sainte-Marie East Overpass, from July 9 to 21, 2026.

2026-06-29

Reconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersection

Reconfiguration of the merge lane onto Saint-Charles Boulevard South at the Sainte-Marie Road East intersection, starting June 29.

2026-06-15

Road Reconstruction – Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St.

Road Reconstruction: Place du Souvenir, Aesop St., Allard St., Derome St., Pasquini St. More details...

2026-06-01

Road Reconstruction – Beaubois Street

Road Reconstruction on Beaubois Street. More details...

Works Info

Stay informed about the work being carried out in the city, whether it involves road repairs, infrastructure maintenance, work on the water network, or park redevelopment. Visit this page regularly to follow the progress of projects. For any questions or to report an issue related to the work, please call 514-694-4100.

Ongoing Works

Last update: July 15, 2026

Finishing work is underway in the area, including driveway paving, restoration of existing paving stones, landscaping work and street cleaning.


Dates: June 1 to mid-July 2026

Targeted location: Beaubois Street

Nature of work: 

  • Reconstruction of curbs, upper foundation and paving
  • Electrical work and replacement of lamp post shafts
  • Replacement of fire hydrants and valves

Traffic: Local traffic will be maintained throughout the duration of the work*.

Information:

514-694-4100, ext. 3143

genie@ville.kirkland.qc.ca 

*Residents planning landscaping work, driveway repairs, exterior painting, window washing or similar projects are advised to wait until the end of the construction period.

 

Allard and Pasquini Streets - Curb Construction Work

The Town will be carrying out curb construction work on Allard and Pasquini Streets on July 16, 2026, starting at 7:00 a.m.

Residents whose properties are located within the work zone will not have access to their driveways for approximately 24 hours. They are therefore asked to remove their vehicles from their driveways and the street before 6:00 a.m. on July 16.

 


Derome Street and Place du Souvenir – Preparatory Work ahead of Curb Construction

The curb construction work scheduled on Place du Souvenir for Friday, July 17, has been cancelled and postponed until next week, on a date to be confirmed. The contractor will carry out the necessary work to ensure that residents can access their private entrances.

The City will carry out preparatory work ahead of curb construction on Derome Street and Place du Souvenir on July 16, 2026, starting at 7:00 am.

Residents whose properties are located within the work zone will not have access to their driveways for approximately 48 hours. They are therefore asked to remove their vehicles from their driveways and the street before 6:00 a.m. on July 16.

Please note : residents will have access to their private entrance throughout the day on Saturday, July 18.

 


Important

To ensure optimum results, it is very important that there be no through traffic within the construction zone throughout this period of time. Residents parking on adjacent streets are asked to follow the temporary parking signage in place.

Please note that in the event of rain or if the work cannot be completed as scheduled, it will be postponed to the next business day.


Dates: June 15 to late August, 2026

Targeted location: Place du Souvenir, Aesop St., Allard St., Derome St. and Pasquini St.

Nature of work: 

  • Reconstruction of curbs, upper foundation and paving
  • Electrical work and installation of LED lighting
  • Replacement of fire hydrants and valves

Traffic: Local traffic will be maintained for the duration of the work.

*Residents planning landscaping work, driveway repairs, exterior painting, window washing or similar projects are advised to wait until the end of the construction period.

Information:

514-694-4100, ext. 3143

genie@ville.kirkland.qc.ca 

Dates: Starting June 29

Location: Saint-Charles Boulevard South, at the intersection of Sainte-Marie Road East

Nature of the work: Work will be carried out to reconfigure the right-turn lane providing access to Saint-Charles Boulevard South from Sainte-Marie Road East. This work is being carried out as part of Sotramont’s ongoing residential development project.

Traffic disruptions to be expected: The existing merge lane onto Saint-Charles Boulevard South will be completely closed. Road users must follow the new signage installed in the area.

Information:

514 694-4100, ext. 3411

genie@ville.kirkland.qc.ca

Dates: July 9 to July 21, 2026

Location: Sainte-Marie East Overpass

Nature of the work: Work will include the reconstruction of certain sidewalk sections as well as drainage corrections, which will be carried out during the day. Scarification and repaving operations on the north and south sections of the roadway, near the approaches to the overpass, will take place overnight, between 9 p.m. and 5 a.m.

Traffic impacts: Lane reductions are to be expected during daytime work. Overnight, the eastbound Sainte-Marie Overpass will be completely closed to traffic. Road users will be asked to follow the signage in place to detour around the work area.

Information:

514-694-4100, ext. 3143

genie@ville.kirkland.qc.ca 

 



An overview of the work to come in 2026...

Click here for a description of the major projects your city has scheduled for completion this coming summer.